EIA Project – Year 2012
Project Nature of Project Remark
Proposed Environmental Impact Assesment for The Proposed Cristine Resort At Bandar Seri Alam, Masai, Johor Darul Takzim for Christine Resort Berhad. Mixed Development Work in progress (50%)
Proposed Commercial Development On Lot 1208, Mukim Pengerang, Daerah Kota Tinggi, Johor Darul Takzim Untuk Tetuan Teguh Kemajuan Sdn. Bhd untuk RJ Planning Consultant Sdn Bhd. Commercial development Work in progress (90%)
Environmental Impact Assesment for Housing Development at Taman Impian Emas for Gunung Impian Development Sdn Bhd. Mixed Development Work in progress (20%)
EIA Project – Year 2011
Project Nature of Project Remark
Preliminary Environmental Impact Assessment (PEIA) for the Proposed Residential Development In Parcel R10 & R11, Nusajaya, Johor Darul Takzim For UEM Land Holdings Berhad Mixed development Approved (August 2011)
Cadangan Projek Ladang Untuk Ternakan Udang Serta Kemudahan Hatchery, Tangki Air, Rumah Pam Dan TNB Di Atas Lot PTD 3703 HS(D) 32177 Dan Sebahagian PTD 4826 HS(D) 31409, PTD 4708 HS(D) 32178 Dan PTD 4827 (PLOT 21) Seluas 1, 042.818 Ekar (422.014 HA), Lembah Makanan Organik Oleh Perbadanan Bioteknologi & Biodiversiti, Mukim Pantai Timur, Daerah Kota Tinggi, Johor Darul Ta'zim Untuk Tetuan Asia Aquaculture (M) Sdn. Bhd. Aquaculture Approved (Julai 2011)
Preliminary Environmental Impact Assessment For Projek Pengeluaran Pasir Daripada Tanah PTD 5051 Kampung Punggai , Mukim Pantai Timur, Daerah Kota Tinggi, Johor Darul Takzim oleh Concrete Gold Sdn Bhd Sand Mining Approved (Jun 2011)
Preliminary Environmental Impact Assessment For Perumahan & Perdagangan Di Atas Lot Ptd 72273 & PTD 72274, Mukim Pulai, Daerah Johor Bahru, Johor Darul Ta'zim For Iskandar Coast Sdn. Bhd Mixed development Approved (April 2011)
Preliminary Environmental Impact Assessment For 'Bangunan Peranginan 'Water Chalet Dan Service Suite' Di Atas Lot Tanah Kerajaan Seluas 43.1 Ekar, Pekan Sungai Menyala, Port Dickson, Negeri Sembilan Darul Khusus Untuk Kl Metro Sdn. Bhd.' For KL Metro Sdn. Bhd Commercial development Approved (April 2011)
Permohonan Kebenaran Merancang Mengikut Seksyen 21, Akta Perancangan Bandar Dan Desa 1976 (Akta 172) Bagi Tujuan Pelancongan (Keluasan 4.32 Ekar) Di Atas Lot 20 Dan Lot 21, Mukim Tioman, Daerah Rompin, Pahang Darul Makmur for First Leisure Sdn Bhd Mixed development Approved (March 2011)
Permohonan Kebenaran Merancang Bagi Tujuan Pembinaan 3 unit Lot Perindustrian, 100 unit Kuarters Pekerja, 1 unit Plot Perdagangan dan Kemudahan Awam Di Atas Lot 20500497, Pulau Daat, Wilayah Persekutuan Labuan oleh RG Gas &Chemical (M) Sdn Bhd Mixed development Approved (January 2011)
EIA Project – Year 2010
Project Nature of Project Remark
Cadangan Pembangunan Kampus Universiti Teknologi Mara (UiTM) Pasir Gudang, Mukim Plentong, Daerah Johor Bahru, Johor Darul Takzim for Damai Abadi Project Management Sdn Bhd Institution Development Approved (November 2010)
Cadangan Pembangunan Penternakan Udang Laut Di Sungai Kim Kim Di Atas Lot 76673, 76674, 76675, 76676 dan 76677, Mukim Plentong dan Di Atas Lot PTD 1287 HS(D) 152734, Mukim Sungai Tiram, Johor Bahru, Johor Darul Takzim oleh YPJ Corporation Sdn Bhd Aquaculture Approved (September 2010)
Permohonan Kebenaran Merancang Di Bawah Seksyen 21 Akta 172, Bagi Tujuan Pembinaan 1 Blok 4 Tingkat Hotel Bajet Di Atas Lot 2287 (GM97) Mukim Serkat, Daerah Pontian For Top Sunbest Sdn Bhd. Hotel Development Approved (September 2010)
" Permohonan Untuk Kerja-Kerja Pengorekan, Pengalihan Dan Pengeluaran Pasir Kawasan Setia Eco Garden (Sp Setia Bhd) Di Atas Lot 2110, Mukim Pulai, Daerah Johor Bahru, Johor Darul Ta'zim." (Additional EIA report by Hwa Hin Sdn Bhd) Sand Mining Approved (August 2010)
Environmental Impact Assessment (EIA) for Sewarage Treatment Plan No. 3, 4, 9 and 10 at Bandar Nusajaya, Johor for Bandar Nusajaya Development Sdn Bhd Sewarage Treatment Plan Approved (July 2010)
EIA Report Preparation For Hotel Development At Lots 499, 500, 506(I) & 506(II), Mukim 11,Teluk Kumbar, S.W.D, Pulau Pinang for KL Metro Development Sdn Bhd Hotel Development Approved (July 2010)
Permohonan Kebenaran Merancang Atas Lot PTD 58150, PTD 58151, PTD 58062, PTD 58064 dan sebahagian PTD 58061 Mukim Tebrau, Daerah Johor Bahru, Johor for Austin Height Sdn Bhd Mixed development Approved (May 2010)
Permohonan Permit 4C Bagi Memindahkan Bahan-Bahan Bantuan Pasir Darat Dan Sungai Di Kawasan Ladang Sungai Papan HS(D) 13179 Lot 356, Mukim Tanjung Surat Daerah Kota Tinggi for Kulim Civilworks Sdn Bhd Sand Mining Approved (April 2010)
Proposed Mixed Development on Lot 2742 Mukim Pulai and Lot 5024 Mukim Senai, Jalan Pontian-Johor Bahru, Johor for Grandeur Park Sdn Bhd Mixed development Approved (April 2010)
The Proposed Upgrading of Approximately 5.2km of Jalan Abu Bakar – Jalan Gertak Merah to a Dual Three Carriage Way at Johor Bahru For Chainage 1600 – Chainage 3500 oleh Iskandar Investment Berhad Road Development Approved (April 2010)
EIA Project – Year 2009
Project Nature of Project Remark
Preliminary Environmental Impact Assessment (PEIA) For Precinct F2 Lot PTB 22056, Mukim Bandaran, Daerah Johor Bahru for Iskandar Waterfront Development Sdn Bhd Mixed Development Approved (August 2009)
Projek Pengeluaran Pasir Di Atas Geran 49875, Lot 4399, Mukim Daerah Kota Tinggi (Ladang Rem Pasak) For Belanga S.P Sdn Bhd Sand Mining Approved (Mac 2009)
Permohanan Kebenaran Merancang (Pindaan) Mengikut Seksyen 21, Akta Perancangan Bandar & Desa, 1976 (Akta 172) Di Atas Sebahagian Lot 2110, 2111, 2112, 2113 Dan 113, Laman Setia, Mukim Pulai, Daerah Johor Bahru, Johor Darul Takzim. For Kesas Kenangan Sdn Bhd Mixed Development/Industrial Development Approved (Mac 2009)
Preliminary Environmental Impact Assessment For Permohonan Ubah Syarat Daripada Pertanian Kepada Ternakan Udang Dan Ikan Di Atas Lot 4448, 4450-4453, 4456-4466, 4469-4471, 5853-5854, 6513-6523, 6528-6530, 6704-6705, 7679, 7978 dan PTD 3463-3464, Mukim Minyak Beku, Daerah Batu Pahat, Johor Darul Takzim Untuk Tetuan Sihai Sdn. Bhd. Aquaculture Approved (January 2009)
EIA Project – Year 2008
Project Nature of Project Remark
Preliminary Environmental Impact Assessment For The Proposed Resort Development On Tapak Tanah Kerajaan Negeri Johor, Sungai Rengit, Pengerang, Mukim Pantai Timur – Kota Tinggi, Johor for JG Resort & Restaurant S/B Resort Development Approved (September 2008)
Preliminary Environmental Impact Assessment For The Ammendment Proposed Development at Phase III (164.75 Ekar) Taman Mawar Tenggara, Bandar Tenggara, Mukim Ulu Sungai Johor, Daerah Kota Tinggi, Johor for Golden Envoy Sdn Bhd Mixed Development Approved (Jun 2008)
Preliminary Environmental Impact Assessment For Project, Design, Build and Completion of Lebuhraya Pesisir Pantai dari Johor Bahru ke Nusajaya for Kota Selat Tebrau Sdn Bhd Coastal Highway Development Approved (May 2008)
Preliminary Environmental Impact Assessment For Proposed Housing Development (152 acres) at Tiram Park on Lot 3638, 3639, 3541, 3543 – 3646 and 1291, Mukim Kota Tinggi, Johor for Binakawa Sdn Bhd Housing Development Approved (May 2008)
Preliminary Environmental Impact Assessment For The Proposed Mix Development On Lot PTD 127593-127598, Mukim Plentong, Daerah Johor Bahru, Johor for Pandan Baru Sdn Bhd Mixed Development Approved (April 2008)
EIA Project – Year 2007
Project Nature of Project Remark
Preliminary Environmental Impact Assessment For The Proposed Development of Water Chalets and Resort Apartment On Pulau Melaka, Daerah Melaka Tengah, Melaka for Seaview Landmark Sdn. Bhd. Water Chalet Resort Approved (December 2007)
Preliminary Environmental Impact Assessment For The Proposed Mix Development On Lot PTD 6234- 6237, 5195, 16554, Mukim Senai-Kulai, Daerah Johor Bahru, Johor for Masa Builder Sdn Bhd Mixed Development Approved (November 2007)
Preliminary Environmental Impact Assessment For The Proposed Mix Development On Lot PTD 64721 & PTD 64723, Daerah Kluang. Johor for MB Capital Sdn Bhd Mixed Development Approved (June 2007)
Preliminary Environmental Impact Assessment For The Proposal Mix Development On Lot 2919 dan 4704 Mukim Simpang Kanan, Batu Pahat, Johor Darul Takzim for Syarikat Perumahan Negara Berhad. Mixed Development Approved (January 2007)
EIA Project – Year 2006
Project Nature of Project Remark
Preliminary Environmental Impact Assessment For The Proposal Mix Development On Lot 2973 dan 2975 Mukim Pulai, Johor Bahru, Johor Darul Takzim For Johline Realty Sdn. Bhd. Mixed Development Approved (July 2006)
Preliminary Environmental Impact Assessment For The Proposed Mix Development On Lot 368, 1242, 1243, 1347, 1701, 2089, 2128-2136 and 44907 (2016.66 acres) at Bandar Sungai Plentong Estate, Mukim Plentong, Daerah Johor Bahru, Johor for Dutawasa Sdn Bhd Mixed Development Approved (June 2006)
Preliminary Environmental Impact Assessment For The Proposed Bungalow & Town House Development On Lot 33438-334475, 71187, 71189, 150125-150727 (PTD 32039- 32667) at Bandar Baru Kota Puteri, Mukim Plentong, Daerah Johor Bahru, Johor for Sri Nuri Development Sdn Bhd Housing Development Approved (June 2006)
Preliminary Environmental Impact Assessment For The Proposed 'Projek Zon Ternakan Unggas' Development On Lot 2116 (280.46 acres) at Kepoh, Mukim Labis, Daerah Segamat, Johor for Jabatan Perkhidmatan Haiwan Negeri Johor. Poultry Farm Approved (May 2006)
Preliminary Environmental Impact Assessment For The Proposed Development of Water Chalets On Lot PT 303, Pekan Port Dickson, Daerah Port Dickson, Negeri Sembilan. Water Chalet Resort Approved (January 2006)
EIA Project – Year 2005
Project Nature of Project Remark
Preliminary Environmental Impact Assessment For The Proposed Mixed Development On Lot 18111 (PTD 8629), Lot 18122 (PTD 8640), PTD 8641, PTD 8642, Lot 18126 (PTD 8646) and Lot 10157, Mukim Hulu Sungai Johor, Daerah Kota Tinggi, Johor . Mixed Development Approved (December 2005)
Cadangan Mempelbagaikan Kod Buangan Bagi Pengumpulan, Pengangkutan, Penstoran & Pemerolehan Kembali Logam Bernilai Daripada Sisa Terjadual Untuk Excelbond Recycling Industries Sdn Bhd. Waste Utilisation Project KIV
Cadangan Mempelbagaikan Kod Buangan Bagi Pengumpulan, Pengangkutan, Penstoran & Pemerolehan Kembali Logam Bernilai Daripada Sisa Terjadual Untuk Estalco Sdn Bhd. Waste Utilisation Submitted / Project KIV
Preliminary EIA on Proposed Upgrading in Production Capacity of Existing Zinc Chloride Plant for Nagai Metal Traders Sdn Bhd. Waste Utilisation Approved (March 2005)
Penilaian Awal Kesan ke atas Alam Sekeliling (EIA) untuk Ladang Penternakan Ayam Semasa di Batu 6, Jalan Batu Pahat, 86000 Kluang, Johor Poultry Farm Approved (February 2005)
EIA Project – Year 2004
Project Nature of Project Remark
Preliminary Environmental Impact Assessment For The Existing Quarry on PTD 3638 (144.95 acre), Mukim Niyur, Daerah Kluang, Johor Quarry Approved (July, 2004)
Preliminary Environmental Impact Assessment for the Proposed Housing Scheme on Lot 6504, 6506, 6507, 6736, 7616, 7638, 8903 and 11686 (289.65 acre) in Sungai Siput, Kuala Kangsar, Perak Darul Ridzuan. Mixed Development Approved (February, 2004)
Penilaian Awalan Kesan Alam Sekeliling Bagi Cadangan Perumahan Di atas PTD 8265, Fasa 9 (138.0 ekar), Bandar Penawar, Mukim Tanjung Surat, Daerah Kota Tinggi. Mixed Development Approved (January, 2004)
EIA Project – Year 2003
Project Nature of Project Remark
Preliminary Environmental Impact Assessment For The Proposed Development of 312 Units of Water Chalets On Lots PT 302 NO. H.S (D) 16214, Bandar Port Dickson, Daerah Port Dickson, Negeri Sembilan Water Chalet Resort Approved (October, 2003)
Preliminary Environmental Impact Assessment For The Proposed Mixed Development On Lots 61-65, 70, 342, 351, 417, 2414 & 3157, Mukim Tebrau And Lots 89-95, 97-98, 100, 825, 1877, 3579, 3590, 3736, 3738, 3744, 3813, 3819, 3821-3822 (6111.36 Acres), Mukim Senai-Kulai, Johor Bahru District, Johor. Mixed Development Approved (August, 2003)
EIA Project – Year 2002
Project Nature of Project Remark
Preliminary Environmental Impact Assessment For The Proposed Development At Package C, Danga Bay Development, Mukim Bandar, Johor Bahru By Messrs. Limbungan Ekovest Sdn Bhd Waterfront Residential Approved (December, 2002)
Preliminary Environmental Impact Assessment For The Proposed Development At Package D, Danga Bay Development, Mukim Bandar, Johor Bahru By Messrs. Limbungan Ekovest Sdn Bhd. Waterfront Residential Approved (December, 2002)
Preliminary Environmental Impact Assessment For The Proposed Development At Package E, Danga Bay Development, Mukim Bandar, Johor Bahru By Messrs. Limbungan Ekovest Sdn Bhd Residential & Recreational Approved (December, 2002)
Preliminary Environmental Impact Assessment For The Proposed Commercial Development At Sungai Lunchoo, Johor Bahru By Messrs. Front Concept Sdn Bhd. Waterfront Commercial Approved (October, 2002)
Penilaian Awalan Kesan Alam Sekeliling Bagi Projek Tapak Pelupusan Sampah Majlis Daerah Kota Tinggi Di Atas Lot PTB 4853, Mukim Kota Tinggi, Johor Darul Ta'zim by Majlis Daerah kota Tinggi. Solid waste disposal Approved (September, 2002)
Preliminary Environmental Impact Assessment For The Proposed Integrated Textile and Garment Manufacturing Plant In Windhoek, Namibia By Messrs. Ramatex Textiles Namibia (Pty) Ltd, Tai Wah Garment (Pty) Ltd & Rhino Garments Namibia (Pty) Ltd. Industrial Approved (September, 2002)
Preliminary Environmental Impact Assessment For The Proposed Development At Package E, Danga Bay Development, Mukim Bandar, Johor Bahru By Messrs. Limbungan Ekovest Sdn Bhd Industrial & Mixed Development Approved (August, 2002)
Preliminary Environmental Impact Assessment For The Proposed Mixed Development On Lot PTD 10772 And Lot PTD 10773, Mukim Kluang, Daerah Kluang, Johor By Messrs. Koperasi Kamajuan Tanah Negeri Johor Berhad. Mixed Development Approved (July, 2002)
Preliminary Environmental Impact Assessment For Waste Utilisation at Sukma Rinting Sdn Bhd, Taman Kota Puteri, Mukim Plentong, Daerah Johor Bahru. Waste Utilisation Project KIV
Preliminary Environmental Impact Assessment For The Proposed Mixed Development Di Atas Tanah Berkelompok Kampung Sungai Serai (800 acres), Mukim Rawang, Selangor Darul Ehsan By Messrs. Bina Alam Bersatu Sdn Bhd (a subsidiary of KUB Berhad) Mixed Development Project KIV
EIA Project – Year 2000
Project Nature of Project Remark
Preliminary Environmental Impact Assessment For SOAP NOODLE Factory For IFFO (M) Sdn Bhd. Industrial Approved (Nov 2000).
Proposed Plentong – Tebrau River Basin Development By Messr. KPRJ Asset Sdn Bhd (Syarikat Anak KPRJ Sdn Bhd). Resort Approved (Oct. 2000)
Proposed Expansion Of BASF Tamol Production Plant, Lot No. 143, Johor Port Authority By BASF (Malaysia) Sdn. Bhd. Industrial (chemical) Approved (April 2000).
Proposed Resort Development at Mukim Mukim Pengerang, Daerah Kota Tinggi By Messr. Imbang Makmur Sdn Bhd Resort Project KIV
EIA Project – Year 1998
Project Nature of Project Remark
Proposed Development at Mukim Tg. Sembrong, Daerah Batu Pahat By Messr. Carrillon Sdn Bhd Industrial Estate Approved (Dec. 1998)
Proposed Development at Majidee Camp, Bandaraya Johor Bahru By Messr. Himpun Bersatu Sdn Bhd. Commercial & Residential Approved (Feb. 1998)
Proposed Resort Development At Tg. Sepang, Mukim Pengerang, Kota Tinggi By Messr. Jadetrans Sdn Bhd. Resort Approved (Feb. 1998)
Proposed Resort Development On Lot 1253 & 1263, Tanjung Punggai, Mukim Pengerang, Kota Tinggi, Johor By Messr. Shikawa Holiday Resort Sdn Bhd. Resort Approved (Feb. 1998)
EIA Project – Year 1997
Project Nature of Project Remark
Proposed Industrial Township At Bakri Estate, Bakri, Muar By Messr. Magna Juta Sdn Bhd. Mixed Development Approved (Sept. 1997)
Proposed Mixed Development At Tongkang Pecah, Batu Pahat, Johor Darul Ta'zim By Messr. Jasa Vista Sdn Bhd. Mixed Development Approved (Sept. 1997)
Proposed Sedili International Resort City At Sungai Sedili Kecil, Kota Tinggi, Johor By Messr. Budiara Enterprise (M) Sdn Bhd. Integrated Tourism Township Project KIV
Proposed Residential Development (793 units) On Reclamation Land At Tanjung Gemuk, Port Dickson, Negeri Sembilan By Messr. Permata Sanctuary Sdn. Bhd. Housing/ Reclamation Project KIV
EIA Project – Year 1996
Project Nature of Project Remark
Proposed Integrated Development At Sungai Pendas (Government Reserved), Mukim Tanjung Kupang Dan Pulai By Kumpulan Prasarana Rakyat Johor (KPRJ) (Dimiliki sepenuhnya oleh Kerajaan Negeri Johor) (Associate with Consortium Aki-Planner) Integrated Dev. Approved (Nov. 1996)
Proposed Integrated Development At Sungai Skudai (Government Reserved), Mukim Johor Bahru, By Kumpulan Prasarana Rakyat Johor (KPRJ)(Dimiliki sepenuhnya oleh Kerajaan Negeri Johor) (Associate with CAP). Integrated Dev. Approved (Oct. 1996)
Proposed Pontian Waterfront At Bandar Pontian Kecil By Pontian Gateways Sdn Bhd (Associate with Consortium Aki- Planner) Waterfront Dev. Approved (July 1996)
Proposed Tourism Development At Tanjung Penyusuh, Pulau Lima & Pulau Besar, Mukim Pantai Timur, Kota Tinggi, Johor By Prisma Bay Sdn Bhd. Tourism Dev. Approved (June 1996).
EIA Project – Year 1995
Project Nature of Project Remark
Proposed Bungalow Development At Kota Tinggi, Johor By Chime Park Sdn Bhd. Residential Approved (Dec. 1995)
Proposed Mixed Development At Sungai Plentong, Mukim Plentong, Johor Bahru By Alasan Kelana Sdn Bhd. Mixed Dev. Approved (Dec. 1995)
Proposed Mixed Development At Mukim Pulai By Tasek Realty Sdn Bhd. Mixed Dev. Approved (Julai 1995)
Proposed Housing & Industrial Dev. at Mukim Grisek,Muar, Johor By Lianzon Development Sdn Bhd. Housing & Ind. Approved (June 1995)
Proposed Bungalow Development at Bandar Penawar, Kota Tinggi. Golf Resort Approved (June 1995)
Proposed Grisek New Township, Mukim Grisek, Muar, Johor By Maharani Properties Sdn Bhd. Mixed Dev. Approved (Mac 1995)
EIA Project – Year 1994
Project Nature of Project Remark
Proposed Waste Incinerator By SNC Ind. Laminates, Pasir Gudang, Johor. Waste Incinerator Integrated Dev. Approved (Dec. 1994)
Proposed Taman Teratai, Mukim Pulai, Johor By Idealland Sdn Bhd. Residential Approved (Dec. 1994)